❖Drafting Module: Key Results
- Can I assign multiple owners to a KR?
- What’s the difference between a milestone KR and an initiative?
- Can I set a different time frame for a KR than for its Objective?
- How do I track a KR that should not fall below/exceed a certain threshold (e.g., minimum 99% availability)?
- Can I track the reduction of a metric as a KR?
- How can I track the progress of Key Results (KRs)?